Employer:
DSİ
Sector:
Dam
Location:
Düzce
Date:
2013
Status:
Completed
Düzce Akçakoca Dam Construction was carried out using the Roller Concrete Compaction (RCC) method and its total water capacity is 2,000,000 m³.
Employer:
DSİ
Sector:
Dam
Location:
Düzce
Date:
2013
Status:
Completed
Düzce Akçakoca Dam Construction was carried out using the Roller Concrete Compaction (RCC) method and its total water capacity is 2,000,000 m³.
