Düzce

Efteni Lake and Kurtderesi Rehabilitation

Employer:
DSİ

Sector:
Water Works

Location:
Düzce

Date:
2023

Status:
In Progress

Düzce-Efteni Lake Rehabilitation Project: This project includes the construction of a flood protection levee, a lake face control structure, and a pipeline for Efteni Lake and its surroundings in the Gölkaya district of Düzce.

Kurt Creek Rehabilitation Project: This project includes the construction of 963 meters of concrete gravity walls, reinforced concrete culverts at five road crossings, a dam, and double-sided guardrails.

Projeler